The Linde Group announced today it has recently been selected by Gazprom and Project EPC contractor SRDI Oil & Gas Peton as the licenser for a mid-scale liquefied natural gas production, storage and shipment complex in Portovaya, located in Russia at the Baltic Sea. The plant will liquefy natural gas coming from the nearby compressor station which is part of Gazprom’s Nord Stream pipeline. 

“Gazprom’s Portovaya LNG Project, which was jointly developed with the Russian engineering holding Peton, is of utmost importance for us as it represents another milestone for the successful strategic cooperation between Gazprom and Linde in the area of cryogenic natural gas processing and liquefaction,” said Professor Dr Aldo Belloni, Chief Executive Officer of Linde AG. “With a yearly capacity of around 1.5 million tons of LNG, the plant fits very well into Linde’s LNG plant portfolio, bridging the gap between small- and world-scale LNG projects.” 

Under the contract with Peton, Linde will perform basic engineering for the process plant and supply the equipment and related bulk material for the cryogenic units of the plant. 

Loading Arms and Systems for Marine, Truck & Rail

malaysia w 400w

Mini LNG Plants

Mini LNG Plant